An Update on The Lavallee Remodeling Project

 

 

 

 

A Good Example of How to Hit A Moving Target

 

 

A few weeks ago, I wrote about the challenges of remodeling and how they pertained to the Lavallee project. I pointed out that these challenges start before construction and continue throughout the project. These moving targets are part of remodeling.

 


Hitting a moving target requires the ability to look ahead and visualize where it’s going.


One of the project goals was increased head room at the top of the stairs on the second floor. The top of the stairs ended in a low vaulted ceiling attic room with a small raised dormer for head room. This area was cramped and dark. It didn’t provide a very usable space.

 

 

 

 

 

 

 

 

 

 

 

 

 

The increased head room was the initial focus. We also planned to remove a dividing wall doubling the square footage of the space. It was still going to have limited head room at the sides of the room but would provide the head room needed to access the second floor and would make a great play area for kids.



The original plan was to install some beams to allow for raising the center portion of the roof and ceiling. As the project progressed, we began seeing another option to gain more usable space by adding to the existing short walls. This option would open the area up more and make it more usable. It would also allow enough wall height for installing two 25” x 25” windows above the porch roof giving the area some great natural light.

 

 

 

 

 

 

 

 

 

 

 


Once the walls were built level it was apparent the floor was not. It was decided to remove the floor from the stairway landing and level it up as well as eliminate the existing broken floor joists. When the original painted tongue and groove wood floor was uncovered it was determined that it should be salvaged and used. At this point we don’t know where yet, but we’ll find the right place.


After seeing the open framed ceiling with a few temporary ceiling joists, the customer asked about leaving it vaulted. After some discussion, we decided to leave it vaulted with a narrow flat ceiling near the ridge and install some beams rather than ceiling joists.


As you can see the targets keep moving and we have the stairway landing one in our sight.


The floor height in the stairway landing area was fifteen inches lower than the height of the second floor. To accommodate this height difference there was a step at the top of the stairway turned 90 degrees. This is not a good design and is not going to work. We are currently planning to cut a step back into the second floor rather than how it is currently.

 

 

 

At our weekly production meeting with the customers earlier this week we discussed the stairway plans. As we talked there were some new and different options that began to surface.

 

I’ve been thinking about some ideas for this stairway since the meeting and have come up with different options. I think this target is on the move and we better get it in our sights.

 

 

 


Check back later to see what direction the stairway goes and how it turns out.

I Love the Challenge of a Good Remodeling Project

 

 

 

If It Was Easy, Anybody Could Do It

 

The challenge of a remodeling project is taking an existing building and turning it into something new while working within the buildings predetermined parameters. Otherwise just tear it down and start over.

 

The remodeling challenge isn’t for everybody.

 

Building new is simpler, it’s a less restrictive clean slate that requires less imagination. Where’s the fun in that?

 

On the other hand, new can be more cost effective than remodeling. This is one of the questions that needs answered early on. If remodeling is the decided-on plan, just be ready for the challenges.

 

The Lavallee remodeling project certainly fits the status of challenging.

 

This project starts with a home that was built in the late 1800s. It has previously gone through numerous remodels and additions. The amount of previous changes makes this project that much more challenging.

 

The project’s goals:

 

  • Increase the size of the master bedroom, add a new master bath and walk in closet.
  • Add a bathroom to the second floor.
  • Widen the narrow stairway to the second floor.
  • Increase headroom at the top of the stairs on the second floor.
  • Open wall between the kitchen and the dining room.
  • Lower the dining room floor height to match the kitchen.
  • Install new windows.
  • Change the exterior of the remodeled part to a low maintenance exterior finished insulation system (EFIS) system.

 

 

The challenges start even before the construction does:

 

  • Is remodeling the best option?
  • What is the project budget?
  • What is the project timeline?
  • Without a blueprint what will the floor plan be?
  • Where do the customer’s plan to live while the work is being done?

 

 

 

As this project gets underway there have been new challenges that have come up. They are hidden inside, behind or under something. Until things are opened up you won’t know what they are. As they do, we address them, find a solution and move forward.

 

A few of the challenges we’re dealt with while digging for the addition foundation:

 

  • Temporarily disconnecting and moving the air conditioning ductwork so the digging could happen.
  • Discovering a buried gas line, determining it was not in use and cutting it out of the way.
  • Finding some unused foundation pilings and determining a plan for dealing with them…final plan yet to be determined.
  • Reconnecting the ductwork so the customer has air conditioning in this upper 90-degree heat.

 

 

I will post more updates to this project as they happen. Check back regularly and watch as this phoenix rises from the ashes.

A Day by Day Accounting of The Dog Playground Project

 

And What a Fun and Challenging Project It Was

 

We all expect things to take less time than they usually do. It’s no different when building an “out of the box” project like a dog playground.


Last week I wrote about the expansion and updating of Prairie Paws Lodging’s facility and what the project consisted of. This week we will review the daily accomplishments and struggles.

 


Preconstruction activities – Before onsite work could go too far, we needed to finalize what materials/processes would be used for the out of the ordinary construction. Some of this was addressed in last week’s solution


One challenge that we didn’t talk about was the need for 50-60 railroad ties. Our supplier wasn’t sure he had that many and couldn’t get more for a couple of weeks. I made a couple of calls and found more if we needed them.


With all the wet weather we’ve had, my go to trucking companies were behind schedule. This presented another major challenge, if we couldn’t get the sand and gravel we needed we weren’t going to accomplish much. Once again having the right connections we were put in contact with Dave Williams of D&Ts Hauling & Excavating, Dave came to the rescue and got us what we needed before we needed it.


Day 1 Monday – We began the day by gathering the first load of railroad ties and skid loader and got them to the job site. We disconnected and removed the portions of the existing fencing that would be relocated. Next we moved the existing pipe framed structure that served as a covered area for the existing run, this was also going to be reused.


The layout of the railroad ties was measured and marked. We placed the first few ties and filled between them with 4”-5” of fill sand and then 2”-3” of ¾” gravel flush with the top of the ties. This brought us out 8’-10’ along the 48’ long east side of the run.

 


Day 2 Tuesday – We started by picking up the concrete culvert and delivering it to the site. Then we picked up where we left off and laid a couple rows of ties west to approximately where they were going to stop. We filled between them with the sand and gravel as before. Then we moved a roll of artificial turf to the raised pad where the building was going to sit and rolled it out.


Day 3 Wednesday – It rained overnight and made things too muddy for onsite work so, I took used the time for organizing and planning.


Day 4 Thursday – We laid rest of the east-west rows of ties, spread more fill and moved the remaining rolls of turf to the areas where the pad was prepped. I began digging the hole in the sand and gravel for the paw shaped pool to set in. To minimize future settling and give us the best base we began compacting with a vibrating compactor. This meant we needed to temporarily roll the first turf back out of the way of the compactor. It wasn’t fastened yet, so this wasn’t much of an issue.

 


Day 5 Friday – We picked up another load of ties first thing today. Then it was more ties, more sand, more gravel, more compacting, and more turf. We cut the ends of the concrete culvert smooth and set it in place. Today we got the first roll of turf lined up, squared up and stapled in place. We knew we were going to be short of sand. I called Dave and he wasn’t going to be able to get any today.


Day 6 Saturday – Dave called me and said he could get me the sand I needed. Thanks again Dave. We began by picking up 35 bags of Quikrete to use for building and shaping the hill. The first thing we did on site was move the building back into place. This was done by temporarily fastening some 2x6s to the ties over the turf to serve as skids, this went well. After it was in place, we pulled the temporary skids and bolted it down to the ties. We spent a big portion of the day designing and building ends for the tunnel/hill out of treated 2×6 tongue and groove. After they were built, we began stacking Quikcrete bags and filling around them with sand and gravel. We ran a few bags short of being able to finish the hill.

 


Day 7 Sunday – No work today, it’s the Lord’s.


Day 8 Monday – It’s getting closer, but still much to do. More ties, more sand, more gravel, more compacting. We finished the hill with the extra bags of Quikrete, sand and gravel. The west side got an additional row of cross ties for future pens to sit on. We rolled out the turf to go over the hill and cut it as needed. Then we rolled out the last roll of turf and cut it around the building offset, remaining gate post and pool. All the turf seams were taped, and the perimeters were stapled down with a few exceptions in areas that needed some special attention.


Day 9 Tuesday – Things are coming together. We reset the chain link fence in the new location, reattached the remaining fence to the building, hung the panels back in the end of the building. Using up the last of the ties, most of the sand, last of the gravel, and we built a raised pad for the new private cottage to sit on. Due to the elevation around the cottage pad we installed some drain tile to one of the downspouts on the original building and buried it in gravel to prevent water from becoming a pond. Next we moved the cottage onto the new pad.


Before we left Ann had dogs out playing in the new yard.

 

Day 10 Wednesday – We did some backfilling around the outside of the ties with the left-over sand and dirt. Loaded up and moved onto the next project.


There are still a few things to finalize. The fire hydrant fountain still needs to be plumbed, but we haven’t got the hydrant yet. I need to install a window AC unit in the new cottage. As is usually the case there will probably be a few more things that might come up.

 

 

I hope this challenging project will give Ann many years of service and her boarders many years of fun and exercise.

How Building Things Is Like Giving Birth

There’s Something Emotionally Fulfilling About Creating

 

I was having a conversation earlier this week with Cheri at Agora Architecture about a project that we are working on. As we visited about the project we both became excited about the new ideas that were developing. I told her that what we’re doing was like giving birth. I then explained what I meant by that and then decided that I should share it with you.


I’ve had this same discussion multiple times over the years. When talking with someone who understands this, the connection is intense. It really is amazing the similarities there are with building and giving birth.

CONCEPTION – “The forming or devising of a plan or idea.” This is where both creating and birthing start. There is a spark or an idea that begins to grow inside of us. Maybe it’s an idea for a new home, a new business, a new design, a new book, a new painting. There is something that has been planted inside by God and we need to pay attention to and act upon it.

GESTATION – “The development of something over a period of time.” As this little idea grows it will want, no need, to get out. We need to be aware and nurture this creation. As it goes through this process it will change on its way to becoming what it is meant to be. This can be painful as the idea continues to grow and stretches us, but it’s a necessary part of the process.

EXTERNAL HELP – When a mother becomes pregnant there is a need for support and help from spouses, family, doctors, nurses, specialists, etc. the same is true for other creations. To the project that I referred to earlier, it started as the idea for a new and used book store and café of Floyd Enterprises. There have been several people involved to this point and will be many more before it is finished. Currently there has been the Floyd family, Debby the realtor, Timber Creek Construction the contractor, Cheri and Hannah the architects. Giving birth requires help and a lot of it.

MESSY – Just like giving birth has some mess involved so do all creations. The process isn’t going to just happen without some clean up.


EXCITEMENT – This is the comparison that I think is the most pronounced. It’s hard to describe the feelings of holding the newborn for the first time. It’s the same when you have been a part of creating something that wasn’t there before. To see, touch and feel that thing that came from somewhere inside and is now tangible is amazing. There is a part of your DNA that has been transferred to it and it will be there forever.

There is something natural about the act of creating, whatever the creation may be. This is something that was implanted in us at our conception. This is God’s DNA in us. We are created in His image, Genesis 1:26-31. He created the world and everything in it. This desire to create and the joy it gives is a part of who we are.

If you haven’t yet figured out what it is that you were put here to create, keep looking until you find it. When you do you’ll know it, because nothing else feels as satisfying as that.

How to Convert Your Construction Project from Unrealistic to Wow

The Importance of Having Realistic Expectations Before the Project Ever Starts

 

One of the most consistent issues that I hear from people who have been involved in construction projects, is disappointment. These displeasures show up in a variety of ways and most often it comes down to unrealistic expectations and less than desired results. This discontentment can come from either customers or contractors and usually the responsibility lies with both.

The solution to this problem also belongs to both.

As a customer you aren’t continuously involved in construction projects. You don’t have the experience and knowledge that construction professionals do. This is not to say that every person or company that claims to be a professional is. It’s important for you to know what you need in a contractor and take the time to find the right one for you and your project.

The excitement that comes with the beginning of a project starts to wain after a while. You just want to have your project, whether it is a big renovation or a small repair, done. You want to get your life back to normal as quickly as possible. Regular life is disrupting enough without a construction project, but to have trades people coming in and out of your home or business periodically and/or unexpectedly wasn’t a part of that initial excitement.

The best way for you to prepare for a construction project is to learn all you can about what is involved, before you start. Even small projects have several pieces that need to be fit together to achieve the desired outcome. This takes knowledge and experience to get these pieces to fit together at the right time and in the right way.

Watching home remodeling programs on television isn’t the best place to learn realistic expectations. Often these programs are more of a problem than a solution. Don’t get me wrong, there is a lot of valuable information that can be gleaned from these shows. The thing you need to realize is that the purpose of these programs is largely to generate viewers not create realistic expectations for your construction project.

This is why it is important to get the right contractor. If a contractor does their job well, all the various pieces will fit together in the way that you wanted. This doesn’t mean that it will be what you initially expected, but rather an informed realistic expectation. What is important for you as the customer to do is to know how to determine if a contractor is the best one for you.

There are several things to consider when looking for a contractor.

  • First and foremost is compatibility. Are they going to be someone that you can work with day in and day out for the duration of the project? This is critical to the outcome.
  • Second is honesty and integrity. Often you can tell this with a few conversations and can confirm it with references.
  • Third is the experience and skill level. How long have they been doing construction and what types of projects have they done previously?

Projects rarely go the way the customer or the contractor think they should or would like, but this doesn’t mean that they need to be disappointing for either. The key is to plan and learn all that you can before you get too far into the process. If you will do this, you will decrease your chances of unrealistic and increase your chances of a wow project in the end.

Getting an Estimate for a Construction Project Can Be a Big Mistake

It’s Like Guessing What a Bag of Groceries Costs Without Being Able to See in The Bag

 

 

One of the most frequent questions that I get asked by customers considering a construction project is…what’s it going to cost. Don’t get me wrong this is one of the most important pieces of information needed before moving forward with a project.

The problem with answering this question comes from the lack of information available in the early part of the process. Sure, there are some basic square footage prices that can be incorporated into giving a quick price, but I learned a long time ago that giving an ESTIMATE without having enough information is a recipe for disaster.

When my customers ask me this question, I tell them it is like looking across the room at a brown paper bag full of groceries and telling someone what it cost. Before I can answer that question, I need to know what’s in the bag. It makes a difference if it is paper towels or steaks, how many and how well they were packed.

The same is true for a construction project – what materials are going to be used, how much is going to be used and how well do you want it built? There is a wide variety of products out there and it is important that your contractor asks enough of the right questions to know what and how many ‘groceries are going in the bag’.

Rarely will I give an estimate. Sometimes, depending on the project, I will for a preliminary ballpark figure. It might save both parties the time and trouble of going forward if there isn’t enough of a budget. The level of accuracy with an estimate is minimal at best.

I encourage my customers to let me give them a proposal. Even if they pay for the proposal, it is much less than the cost of the project and a sound investment. When pricing a construction project, the dollars are significant enough that you should know what to expect before you get started and run out of money.

“But don’t begin until you count the cost. For who would begin construction of a building without first calculating the cost to see if there is enough money to finish it? Otherwise, you might complete only the foundation before running out of money, and then everyone would laugh at you. They would say, ‘There’s the person who started that building and couldn’t afford to finish it!’

Luke 14:28-30, NLT

Doing an accurate and detailed proposal takes time and effort. Most contractors are more focused on getting to the money generating construction and neglect the proposal process. I’m convinced that the proposal is as important of an investment for the contractor as it is for the customer.

You can see an example of our proposals here – http://www.timbercreekconstruction.us/Proposal-Estimate_Sample.php.

The number of stories that I have heard of unhappy customers or contractors not getting paid for all the work they did is unnecessary. This problem can be enormously reduced by giving an accurate, agreed upon price in the beginning. That way when the project is finished everyone can be happy.

5 Ways Builders Should Treat Customers

It’s Not Just a Job…It’s Someone’s Dream 

16467607441_060db08b96_o

 

Over the years as I have discussed building projects with people, a lot of people. There are those who have had the experience of building a new home, doing a remodel or even a small repair project. The number of times that I have heard them say, ‘it was the worst experience of my life’, breaks my heart. The experience of repairing, remodeling or building new should be counted among their best experiences, not their worst. In many cases they only get the opportunity to experience a project, especially a large one, once. This makes it even more critical that we do what we can to make this as enjoyable and painless as possible.

A building project is like having a child. For me the designing, developing and building something is an amazing experience. It is more than just the mechanical act of pouring some concrete, nailing two boards together, putting a window in a hole or slapping on some paint. The collaboration between the parties involved should be fun and exciting. A part of me is poured into each and every project. Once it is done, I step back and look at it. Something that wasn’t before and is now…it is a part of me and I am a part of it. I’m continually moved when I see projects that I was involved in over the years. Approaching construction in this perspective is key to the conception, gestation and birth of each new project.

The builder carries the majority of the responsibility. Those of us in the building industry go through the process over and over again. We can get used to the daily routine of construction. We forget that the customer doesn’t do this daily like we do. This is something that can be scary and overwhelming to the person wanting to have some repairs done, add on a room or build a new home. As builders we need to remember to approach each new customer with an open mind and a desire to help them build their dream.

Things that the builder should do:

  • Communicate – Let the customer know what to expect. Remember that they don’t do this day in and day out like you do.
  • Listen – This is the most important part of communicating. You need to hear what the customer is saying. This is more than just their words.
  • Be on time – Show up when you say you will. Respect their time.
  • Be responsive – Return communications in a reasonable amount of time. They just want to know that you hear them and care.
  • Be accountable – If you or someone on your team make a mistake, own up to it. Don’t blame someone else.

Remember the Golden Rule and treat your customer the way you would like to be treated, not the way you have been treated.